Septic Inspection in Cedar Creek, TX (Bastrop County)
Septic inspection in Cedar Creek is a Real Estate Inspection package: $700 to pump the tank (up to 1,250 gallons) plus $250 for the detailed inspection letter, $950 total. Every Mac Septic inspection includes a full pump because you cannot grade a tank you cannot see the bottom of. We do not offer an inspection on its own. Reports come back in two to three business days with photos. Call 512-737-8711 to book.
Need septic service in Cedar Creek TX now?
Call (512) 737-8711Septic prices in Cedar Creek
| Service | Price |
|---|---|
| Septic pump-out, up to 1,250 gallons | $725 |
| Tanks over 1,250 gallons | $0.60 a gallon for each gallon over 1,250 |
| Real estate inspection: pump-out plus inspection letter with photos | $950 $700 pump-out plus $250 letter |
| Inspection letter only (tank pumped in the last 12 months) | $350 |
| Aerobic maintenance contract, 3 visits a year | $125 a visit up to 25 miles from San Marcos (gas surcharge past that) |
| Labor beyond the pump-out (digging, locating, extra work) | $175 an hour $150 for contract customers |
Prices are stated up front. If the job needs more than the pump-out (a buried lid, hard-set solids), we tell you the cost before the work starts.

Why inspections matter in Cedar Creek
Most inspections we do in Bastrop County are tied to a property sale. Cedar Creek and the rest of unincorporated Bastrop run almost entirely on private aerobic systems, and the county's rules around those systems travel with the property. If the seller has been off contract for years and has never filed the self-maintenance affidavit, the buyer inherits that gap. A real inspection catches that picture before the closing date, not after.
The Cedar Creek post-fire story is the version of this that matters most. The 2011 Bastrop Complex Fire took out more than 1,600 homes in this area. The rebuilds (2012 to 2014) almost all got new aerobic ATUs. Every one of those came with a mandatory 2-year licensed maintenance contract at install. Every one of those contracts expired by 2014, 2015, or 2016. A lot of those systems then went into a quiet decade with no contract, no affidavit on file, no quarterly reports. The system kept working, the alarm never went off, and the paperwork went dark.
That is the system a buyer walks into. Mechanically fine, paperwork blank. We grade both pieces on the inspection.
What we inspect
Every standard inspection covers:
- Tank walls, floor, and ceiling condition (with photos)
- Pump and float performance
- Drainfield distribution check
- Alarm and aerator function on aerobic units
- Spray heads or drip lines for surface signs of trouble
- Direct on-site feedback to you or your realtor
- Written repair recommendations with rough cost ranges
- Maintenance file status check against Bastrop County records
We pump the tank for every Texas inspection. There is no way to grade a tank wall, baffle, or floor through a layer of solids and scum. Pump first, look second, write the report.
Pricing
- Real Estate Inspection pump-out (full pump, up to 1,250 gallons): $700
- Inspection letter with photos: $250
- Real Estate Inspection package total: $950
- Expedited turnaround for last-minute closings: additional fee, quoted at booking
Report turnaround is 2 to 3 business days. If a closing is faster than that, tell us at booking and we will quote the expedite.
Real estate timing in Cedar Creek
For a closing on a Cedar Creek property, the timeline that works is:
- Book the inspection at least a week before closing.
- We pump and inspect in the same visit.
- Report email comes in 2 to 3 business days with photos and recommendations.
- If repairs are needed, you have time to negotiate them into the contract.
- If the system has no current contract on file, we set that up before closing, OR we walk you through the self-maintenance affidavit option with Bastrop County.
If your closing is tight, we expedite. Just say so at booking.
The Bastrop affidavit option (important for buyers)
This is the part that makes Bastrop different from Caldwell next door. In Caldwell County, there is no homeowner self-maintenance option. The affidavit on file says it has to be a licensed maintenance company, period. Bastrop is more flexible. The Bastrop rule is:
- Year 1 and Year 2 after install: mandatory licensed maintenance contract.
- After Year 2: keep the licensed contract, OR file the self-maintenance Affidavit with Bastrop County, complete the required training, and run the quarterly reports yourself.
For a Cedar Creek buyer, that means there is a budget tradeoff to think about. The licensed contract is $375 a year ($125 a visit, annual auto-renewing). The affidavit option is one-time training plus your own labor every four months. We will tell you which one fits your situation. Most buyers want the contract for the first year or two, then decide. (Note: the maintenance contract is an annual evergreen agreement. If you cancel mid-term, you pay for the remaining scheduled visits in the 12-month term. No partial refunds.)
What the report tells you
Plain English. No filler. A buyer or seller should be able to read the report once and know:
- Whether the tank is sound (no cracks, no settling, no inlet/outlet damage)
- Whether the drainfield is taking water
- Whether the aerobic system is producing clean effluent
- Whether the alarm, aerator, and pump are working
- What needs to be fixed, and roughly what it costs
- Whether the system is in compliance with Bastrop County's affidavit/contract rules, and what it takes to get there if not
We use rough cost ranges from our published menu. Pump replacement is $3,000 to $5,000. Drainfield replacement is $6,000 to $10,000. Hydro-jet is $300. Hourly diagnostic is $175 with a 1-hour minimum ($150 for active contract customers). No surprises later.
Bastrop County compliance points
Bastrop County Development Services (211 Jackson Street, Bastrop TX 78602, phone 512-581-7176) holds the OSSF permit and maintenance file for every aerobic system in the county. Cedar Creek is unincorporated, so all of these records sit with Bastrop, not with a city.
- Permits required regardless of acreage. No minimum-size exemption.
- Lots a half acre or smaller need an Engineer or Registered Sanitarian design.
- Aerobic ATU: 2-year mandatory licensed contract at install. After year 2, contract or affidavit.
- Reports every 4 months (TCEQ baseline).
- 30-day cure window if a contract lapses.
- Bastrop County program page describes the order as "more stringent than state rules."
If we do the inspection and the buyer wants a contract on day one, we write it. $125 a visit. We file with the county.
FAQ
Is the inspection enough on its own, or do I have to pump too?
We pump on every Texas inspection. You cannot grade a tank you cannot see the bottom of. We do not offer an inspection on its own in Texas. Every inspection is the Real Estate Inspection package: $950 ($700 pump up to 1,250 gallons plus $250 letter).
How long does the visit take?
Plan on 90 to 120 minutes on site. The report comes 2 to 3 business days later.
Can you push the report through faster for a closing?
Yes. There is an expedite fee, quoted at booking. Tell us the closing date.
The seller says they have been doing their own maintenance. Is that okay in Bastrop County?
Maybe. Bastrop allows owner self-maintenance after year 2, but only if the owner filed the Affidavit, completed the training, and has been filing quarterly reports. If they did not do all three, they are not actually covered. We can pull the maintenance file from the county to verify.
What if the inspection finds a problem?
We quote the fix on the spot. If it is small (baffle, distribution box, alarm), $175 an hour with a 1-hour minimum ($150 an hour for active contract customers). If it is big (pump or drainfield), the ranges above. You decide whether to fix it before closing or roll it into the contract.
My closing is on a post-fire rebuild. What is the typical condition?
Mechanically the systems hold up fine for 15 to 20 years when used reasonably. The common issues we see on Cedar Creek post-fire rebuilds are a worn aerator (replace at $175/hr plus part, $150/hr for contract customers), chlorine tablet depletion (chlorine tablets are a paid add-on, charged separately), and a tilted distribution box (reset at $175/hr, $150/hr for contract customers). None of those are dealbreakers.
Does the inspection cover the entire aerobic system?
Yes. All four chambers (trash, aerobic, settling, pump), the disinfection step, and the spray or drip distribution. Norweco Singulair, Clearstream, Jet, Hoot, Aqua-Safe, we work all of them.
Next steps
Call 512-737-8711. We are TCEQ licensed. We serve Cedar Creek, Bastrop, Smithville, Elgin, Red Rock, and McDade.
Related septic services in Cedar Creek TX
- Septic pumping in Cedar Creek TX
- Septic repair in Cedar Creek TX
- Drainfield repair and replacement in Cedar Creek TX
- Grease trap pumping in Cedar Creek TX
- Emergency septic service in Cedar Creek TX
View all septic services in Cedar Creek TX
References
County and state authorities cited on this page. County rules change; contact your county environmental health office for the current requirements.
Bastrop County, TX
- Bastrop County OSSF program page
- Bastrop County OSSF Application Packet (PDF, rev. 6/20/2024)
- Bastrop County TCEQ-Approved OSSF Order (PDF)
- Bastrop County Aerobic OSSF Affidavit (PDF, 2019)
State of Texas
- 30 TAC Chapter 285: TCEQ on-site sewage facility rules
- Texas Health & Safety Code Ch. 366: OSSF disposal statute
- Texas Water Code Ch. 7: enforcement and max penalties
- TCEQ OSSF Maintenance program
- 30 TAC Chapter 213: Edwards Aquifer Protection (Hays, Comal, Travis, Bexar)
Verified 2026-05-11.
Ready to schedule, or have a question?
Call us at (512) 737-8711 or use the contact form. Same-day or next-day in most cases.
Call nowSeptic installs. Need a new or replacement system in Cedar Creek? We coordinate installs with a licensed installer and quote each one after a site evaluation. See the septic installation page.
