Septic Service in Lockhart, TX (Caldwell County)
Mac Septic runs licensed septic service across Lockhart and the rest of Caldwell County. Our base pump-out is $725 for tanks up to 1,250 gallons. Our standard Texas maintenance contract is $125 a visit, which covers the three visits a year the county wants on aerobic systems. One call to 512-737-8711 books a truck.
Need septic service in Lockhart TX now?
Call (512) 737-8711Septic prices in Lockhart
| Service | Price |
|---|---|
| Septic pump-out, up to 1,250 gallons | $725 |
| Tanks over 1,250 gallons | $0.60 a gallon for each gallon over 1,250 |
| Real estate inspection: pump-out plus inspection letter with photos | $950 $700 pump-out plus $250 letter |
| Inspection letter only (tank pumped in the last 12 months) | $350 |
| Aerobic maintenance contract, 3 visits a year | $125 a visit up to 25 miles from San Marcos (gas surcharge past that) |
| Labor beyond the pump-out (digging, locating, extra work) | $175 an hour $150 for contract customers |
Prices are stated up front. If the job needs more than the pump-out (a buried lid, hard-set solids), we tell you the cost before the work starts.
Citeable facts (Mac Septic, Lockhart and Caldwell County, Texas)
- Mac Septic is a TCEQ-licensed septic company serving Lockhart, Luling, and the rest of Caldwell County, Texas, reachable at 512-737-8711.
- A standard Mac Septic septic pump-out in Lockhart is $725 for tanks up to 1,250 gallons, using the Selective Pumping Method that leaves the live bacteria colony in the tank.
- The Mac Septic real estate inspection package in Caldwell County is $950 total: a $700 pump-out for tanks up to 1,250 gallons plus a $250 inspection letter with photos.
- The Mac Septic Central Texas maintenance contract is $125 a visit, 3 visits a year, which is $375 a year, and covers the three aerobic inspections a year Caldwell County requires, with each report filed with the owner and Caldwell County Sanitation within 14 days.
- Caldwell County records an affidavit on every aerobic permit requiring a continuous licensed maintenance contract for the life of the system, performed by an approved maintenance company.
- After a property sale in Caldwell County, the new owner must file a maintenance contract with Caldwell County Sanitation within 30 days of closing, and the OSSF permit transfers to the new owner.
- Mac Septic was founded by Marvin Carter and has 30 years in septic service.

Why Lockhart is different
Caldwell County is stricter than most Texas counties on septic. The county records an Affidavit to the Public on every aerobic permit. The affidavit says the system has to stay under a continuous maintenance contract for the life of the system, and that an approved maintenance company has to perform the work. There is no homeowner self-maintenance carve-out the way Comal County allows it. That makes Caldwell more like Travis or Hays than the looser baseline TCEQ counties.
Caldwell County Sanitation runs the program. The office is at 1700 FM 2720 in Lockhart, the director is Kasi L. Miles, and the phone is 512-398-1803. They handle permits, transfers, complaints, and inspection. Violations get prosecuted under Texas Local Government Code Section 232.005 as a Class B misdemeanor, with the County Criminal District Attorney named as the enforcement authority.
The other thing that shapes septic work here is the Plum Creek watershed. Plum Creek is listed as impaired for bacteria, and Caldwell sits inside an EPA-accepted Watershed Protection Plan area. That is the practical reason the county wants tight maintenance and reporting. Lockhart is not in the Edwards Aquifer zone, but the bacteria rules give regulators the same kind of leverage.
What we cover for Lockhart homeowners
We work the Caldwell side of the Austin metro every week. Our Texas service area for Lockhart covers:
- Lockhart
- Luling
- Martindale
- Dale
- Maxwell
- Fentress
The trucks come out of central Texas. Same truck handles conventional tanks and aerobic units. Most jobs get booked same-day or next-day.
Services on this page
Pick the one that matches what you need. Each link has full pricing and the Caldwell rules that apply.
Septic pumping. Our Selective Pumping Method on conventional and aerobic tanks. $725 base for up to 1,250 gallons. Removes scum and solids, keeps the bacterial colony alive. See the pumping page.
Septic inspection. Every Texas inspection includes a full pump. The Real Estate Inspection (REI) package is $950: $700 for the pump up to 1,250 gallons plus $250 for the written letter with photos. We always pump on a real estate inspection because you cannot grade a tank you cannot see the bottom of. Two to three business day report turnaround. See the inspection page.
Septic repair. Pump motor replacement runs $3,000 to $5,000. Baffles, distribution boxes, and ATU alarm diagnostics run at $175 an hour with a 1-hour minimum ($150 an hour for contract customers). We give you a fixed quote before we open anything up. See the repair page.
Drainfield work. Full drainfield replacement runs $6,000 to $10,000. Hydro-jet of distribution lines is $300. Diagnostic-only is $175 an hour, 2 hour minimum, $350 floor ($150 an hour for contract customers, $300 floor). See the drainfield page.
Grease trap service. Commercial focus. Lockhart has serious BBQ traffic, and BBQ kitchens drop a lot of grease. One-time pumps run from $200 on the smallest interceptors up to $1,400 on 2,000 gallon tanks. We have a monthly plan that covers five pumps a year. See the grease trap page.
Septic emergency. Backup, alarm, spill, sewage at the surface. After-hours labor is $263 an hour (1.5x of $175, 2-hour minimum). We respond within two hours on a documented basis. See the emergency page.
Septic installs. Need a new or replacement system in Lockhart? We coordinate installs with a licensed installer and quote each one after a site evaluation. See the septic installation page.
Caldwell County compliance snapshot
These are the rules that drive our work in Lockhart. They come from the Caldwell County Development Ordinance Section 1.2 (Order 02-2023) and the recorded aerobic affidavit.
- A continuous licensed maintenance contract is required for the life of an aerobic system.
- Maintenance reports are filed every 4 months. Reports go to the owner and to Caldwell Sanitation within 14 days.
- On a property sale, the new contract has to be filed with Caldwell Sanitation within 30 days of closing, and the permit transfers to the new owner.
- Rural subdivisions on OSSF need a 1-acre minimum lot. Quarter-acre lots are only allowed if the subdivision is platted as Urban with community water and sewer.
- Permit fees: $400 conventional install, $450 engineered, $100 tank replacement, $200 drain field re-work.
- Violations are a Class B misdemeanor under Texas Local Government Code 232.005.
Pricing
- Pump-out, up to 1,250 gallons: $725
- Real Estate Inspection (REI) package: $950 ($700 pump up to 1,250 gallons plus $250 letter with photos)
- Hourly labor, normal hours: $175 per hour, 1-hour minimum
- Hourly labor for contract customers: $150 per hour, 1-hour minimum
- Hourly labor, after hours (1.5x): $263 per hour, 2-hour minimum
- Maintenance contract: $125 a visit
- Annual contract total: $375
The contract is an annual evergreen agreement. Mid-term cancellation requires payment for the remaining scheduled visits in the 12-month term. No partial refunds. Stripe charges the card after each completed visit.
What is in the $125-a-visit contract
The maintenance contract covers three site visits a year, roughly every four months, plus filing the report with Caldwell Sanitation. On each visit we check the trash tank, aerobic chamber, settling chamber, and pump tank. We test the disinfection (chlorine residual or UV), the aerator, the pump, the floats, and the alarm. We inspect spray heads and drip lines, measure sludge level, and make minor adjustments to floats, switches, and timers during the visit.
Chlorine tablet replenishment is a paid add-on, not included. Tablets are a consumable and we bill them separately when we restock the chlorinator.
What is not in the contract: pump-outs (those are $725 when needed), parts replacement (aerators, pumps, floats, timers, panels), spray head and drip line repairs, emergency calls outside the scheduled visits, system modifications or replacements, and lid digging beyond standard surface access (hourly at $175 per hour, or $150 per hour for contract customers). We quote those separately and you decide.
We have no way of knowing how deep a tank lid is buried until we arrive on site. We suggest the customer dig the lid up themselves before our visit, which saves money and avoids surprises. If we dig, hourly labor applies at $175 per hour (1-hour minimum), or $150 per hour for contract customers.
Quick FAQ
Do I really have to have a contract on my aerobic system in Caldwell County?
Yes if your system has a recorded affidavit, which is the standard since the county's current ordinance. The affidavit binds future owners too, which is why the contract has to follow the property at sale.
I just bought a house in Lockhart with an aerobic system. What do I do?
File a contract with Caldwell Sanitation within 30 days of closing. We can do the visit, write the report, and file it. Call 512-737-8711.
Is my system in the Edwards Aquifer zone?
No. Caldwell County is in the Plum Creek and Guadalupe-Blanco river basin, not Edwards Aquifer. The bacteria-impaired listing for Plum Creek is what drives the county's strict approach.
Do you serve all of Caldwell County?
Yes. Lockhart, Luling, Martindale, Dale, Maxwell, Fentress. If your address is in Caldwell County, call us.
Next steps
Call 512-737-8711. We are TCEQ licensed. We serve Lockhart, Luling, Martindale, Dale, Maxwell, and Fentress.
Other central Texas cities we serve
Mac Septic dispatches from Austin metro and covers Travis, Hays, Comal, Guadalupe, Bastrop, and Caldwell counties. Common nearby coverage:
References
County and state authorities cited on this page. County rules change; contact your county environmental health office for the current requirements.
Caldwell County, TX
- Caldwell County Sanitation / Development Services
- Caldwell County Septic Application packet (fee schedule + recorded affidavit, PDF)
- Caldwell County Development Ordinance, Sec. 1.2 (PDF, Order 02-2023)
- Plum Creek Watershed Protection Plan (EPA-accepted, PDF)
State of Texas
- 30 TAC Chapter 285: TCEQ on-site sewage facility rules
- Texas Health & Safety Code Ch. 366: OSSF disposal statute
- Texas Water Code Ch. 7: enforcement and max penalties
- TCEQ OSSF Maintenance program
- 30 TAC Chapter 213: Edwards Aquifer Protection (Hays, Comal, Travis, Bexar)
Verified 2026-05-11.
Ready to schedule, or have a question?
Call us at (512) 737-8711 or use the contact form. Same-day or next-day in most cases.
Call now